Progress

(v.1) Project Open 1

Status: Completed 2017 (Plan Set)

Units: 112 (1 bedroom)
Affordability: 70% Affordable (25-50% AMI), 30% Market
HVAC System: Heat Pumps (backup heat resistance in blowers)
Water Heating: Electric Tankless
Project Savings (before rebates): $62,000
Notes: RMP Subscriber Solar; First carbon-neutral multifamily in SLC to save construction costs

(v.2a) Project Open 2

Status: Completed 2020 (Plan Set)

Units: 95; Studio - 4 bedroom
Affordability: 78% Affordable (25-50% AMI); 22% Market
HVAC System: Heat Pumps w/ fan coils; Cold-weather mini split
Water Heating: Electric tank with heat pump; tankless
Project Savings (before rebates): $250,000
Notes: Expands types of units in our research, including 8 live/work

(v.2b) The Exchange

Status: Completed 2021 (Plan Set)

Units: 412; Micro - 3 bedroom
Affordability: 48% Affordable (40-80% AMI); 52% Market
HVAC System: Heat pumps; Cold-weather mini split
Water Heating: Electric Tankless
Project Savings (before rebates): $450,000
Notes: 9 Story mixed-use project in the heart of downtown

(v.3) Pamela’s Place - Housing Authority of Salt Lake City

Status: Completed 2020 (Plan Set)

Units: 100; Studio
Affordability: 100% Permanent Supportive Housing
HVAC System: Cold-weather mini split
Water Heating: Centralized electric hybrid tank w/ unit meters
Project Savings (before rebates): $400,000
Notes: Built for people exiting homelessness due to a shelter closure. 29.20kW solar PV (dashboard).

(v.4) Citizens West

Status: Completed 2021 (Plan Set)

Units: 80; Studio - 3 bedroom
Affordability: 68% Affordable (25-50% AMI); 32% Market
HVAC System: Cold-weather mini split
Water Heating: Centralized hybrid electric tank w/ unit meters tied to onsite solar with battery backup
Project Savings (before rebates): $133,434.32